|
| ObjectProperty |
|
| Amount in designated currency for work, either a total or an individual element. As defined in the attribute "type," multiple instances are applicable to each work for: planned cost, actual cost, authorized cost, budgeted cost, forecasted cost, other. |
| References | |
|---|---|
| |
Generated with TopBraid Composer by TopQuadrant, Inc.