![]() | DatatypeProperty |
![]() | The RUC Schedule of a resource is its output level that balances the load forecast used in RUC. The RUC Schedule in RUC is similar to the DA Schedule in DAM. |
![]() | float |
References | |
---|---|
|
Generated with TopBraid Composer by TopQuadrant, Inc.