http://www.iec.ch/TC57/CIM#MaxStartUpCostCurve
Class cim:MaxStartUpCostCurve


type
Class [owl:Class]
comment
The maximum Startup costs and time as a function of down time. Relationship between unit startup cost (Y1-axis) vs. unit elapsed down time (X-axis). This is used to validate the information provided in the Bid.
subClassOf
cim:Curve

Generated with TopBraid Composer by TopQuadrant, Inc.