
|
| Class [owl:Class] |
|
| The hydro pump's Operator-approved current operating schedule (or plan), typically produced with the aid of unit commitment type analyses.The unit's operating schedule status is typically given as: (0=unavailable) (1=avilable to startup or shutdown) (2=must pump). |
| References | |
|---|---|
| |
Generated with TopBraid Composer by TopQuadrant, Inc.