
|
| Class [owl:Class] |
|
| The generating unit's Operator-approved current operating schedule (or plan), typically produced with the aid of unit commitment type analyses. The X-axis represents absolute time. The Y1-axis represents the status (0=off-line and unavailable: 1=available: 2=must run: 3=must run at fixed power value: etc.). The Y2-axis represents the must run fixed power value where required. |
| References | |
|---|---|
| |
Generated with TopBraid Composer by TopQuadrant, Inc.