ObjectProperty |
Operating reserve requirement in MW, where operating reserve is the generating capability that is fully available within 30 minutes. Operating reserve is composed of primary reserve (t less than 10 min) and secondary reserve (10 less than t less than 30 min). |
References | |
---|---|
|
Generated with TopBraid Composer by TopQuadrant, Inc.